Baltic Shipping Company
Location
Port of Tallinn
MV Northern Star, 15,000 DWT Cargo Vessel
Duration
January 15, 2023 - January 25, 2023
The Challenge
The vessel experienced a catastrophic failure of its main hydraulic steering system while preparing to depart port. The failure was traced to a combination of damaged control valves and a failed hydraulic pump. With cargo already loaded and a tight delivery schedule, every hour of delay meant significant financial penalties.
Solution: Our emergency response team arrived on-site promptly after the initial call.
Our Solution
Our emergency response team arrived on-site promptly after the initial call. After a comprehensive diagnostic assessment, we:
- Removed and dismantled the faulty hydraulic pump
- Replaced damaged bearings and seals
- Reconditioned the control valves using our mobile workshop equipment
- Performed comprehensive system flushing to remove contamination
- Reassembled and tested the entire steering system under operational load conditions
Results and Benefits
- Complete repair completed in under 36 hours
- Vessel passed port authority inspection without remarks
- Departure delayed by only one day, saving approximately €25,000 in potential demurrage fees
- Follow-up inspection after 3 months showed perfect system operation
Photo Gallery
Back to Projects