Emergency Hydraulic System Repair for Commercial Cargo Vessel

Client

Baltic Shipping Company

Location

Port of Tallinn

Vessel

MV Northern Star, 15,000 DWT Cargo Vessel

Duration

January 15, 2023 - January 25, 2023

The Challenge

The vessel experienced a catastrophic failure of its main hydraulic steering system while preparing to depart port. The failure was traced to a combination of damaged control valves and a failed hydraulic pump. With cargo already loaded and a tight delivery schedule, every hour of delay meant significant financial penalties.
Solution: Our emergency response team arrived on-site promptly after the initial call.

Our Solution

Our emergency response team arrived on-site promptly after the initial call. After a comprehensive diagnostic assessment, we:

  • Removed and dismantled the faulty hydraulic pump
  • Replaced damaged bearings and seals
  • Reconditioned the control valves using our mobile workshop equipment
  • Performed comprehensive system flushing to remove contamination
  • Reassembled and tested the entire steering system under operational load conditions

Results and Benefits

  • Complete repair completed in under 36 hours
  • Vessel passed port authority inspection without remarks
  • Departure delayed by only one day, saving approximately €25,000 in potential demurrage fees
  • Follow-up inspection after 3 months showed perfect system operation